![](/assets/pack/background/banner.2404100622550.jpg)
First and Third Party Construction Scheduling / Cost Audits
Amherst provides independent construction scheduling, and/or cost audits for both first and third party claims' evaluation. Oftentimes claims become an issue with costs or additional damages when scheduling of a construction project or reconstruction project becomes stacked or out of sequence. Amherst provides an analysis of existing schedules that may aid in determining coverage on a loss or claim.
A good percentage of Amherst's cost auditing is after the fact wherein a claim is made for a first party loss such as a fire or a third party loss such as a product failure. In all cases Amherst can provide analyses of the costs incurred to determine if they are fair and reasonable as well as determining what damages are direct and resultant.
Have questions or need assistance? Contact us now to discuss your project needs with our expert team.
![](/assets/pack/background/placeholder.2305221104550.jpg)
Our Recent Case Studies & Results
Our top priority is to devise customized legal strategies that are tailored to the unique legal needs of our clients, no matter how simple or complicated their situations, might be.
-
3.2 Million Hawaii high-rise residential building – fire in one unit
A fire occurred in a residential building in Honolulu destroying the interior of one unit and distributing varying amounts of smoke throughout the remainder of the building. The owner of the building retained the services of Public Adjuster (PA). The PA filed the repair claim on behalf of the owner/insured. The claim included repairs and cleanup but also included numerous code upgrades, the largest of which was replacement of all windows. The PA submitted a letter detailing that, as part of the fire repairs
-
Favorable Nevada community development – insurance claim for structural damage
The upscale community development included a total of 14,000 homes. The first 2,000 homes developed cracks in the foundation resulting in slab heaving, structural cracks and out of plumb structural walls, windows, ceilings, etc. The developer submitted an insurance claim for corrective repairs of the 2,000 homes in the amount of $50,000,000.00. The primary insurer paid policy limits for the claim.
-
8 Million New York City high-rise condominium building and retail plaza – Superstorm Sandy
The high-rise condominium office building and retail plaza experienced partial flooding in its subterranean parking garage. Located within the floor of the garage were two below grade electrical utility vaults, approximately 7 feet in depth, where multiple horizontal 480-volt power supply feeder cables were spliced together. At the time of the occurrence, this distribution system was de-energized. The vaults were manually pumped out and the distribution system was inspected and re-energized. The distributio
-
In Litigation Northern California car dealership – construction defect, new construction
A very centrally located, beautiful 32,000 sq. ft. new car dealership was built in 2016 in northern California. The facility included 13,000 sq. ft. contemporary designed showroom, 13,000 sq. ft. state-of-the-art service area and 6,000 sq. ft. of upstairs office area. As soon as the owner took possession of the building, plumbing problems started requiring digging up some of the showroom, first floor office area and service area floors.
-
8 Hundred Thousand Northern California High Rise Office Building – Water discharge on Floor 18
Amherst was retained by the insurance company for the 18th Floor Tenant. A piece of equipment used by the tenant was the source of the water discharge. Amherst's scope of work was to audit scope of work and costs claimed for repairs of the 18th Floor, the 17th Floor and the building core, mechanical chase and elevator cars, motors, cables and shafts . Amherst was retained to provide expert opinion as to the scope of work and costs that were found to be fair and reasonable.
![](/assets/pack/foreground/content-2.2404091312550.jpg)